You have downloaded this file 0 times in the last 24 hours, limit is 50.
Your file downloads total 0 in the last 24 hours, limit is 100.

Enabling Contiguous Node Scheduling on the Cray XT3 Download

Thank you for downloading Enabling Contiguous Node Scheduling on the Cray XT3

If your download does not start automatically after a few seconds, please click on the Download link above

Description:

The Pittsburgh Supercomputing Center (PSC) has implemented a flexible job scheduling environment to enable jobs to be placed onto its Cray XT3 system in ways that can help them achieve better performance.

An overview of past work will be provided, discussing changes made to the batch system, work on a graphical machine monitor to help visualize jobs placed on the system, and node assignment changes to help minimize communication overhead to all jobs.


Finally, a summary of work done to accommodate applications that are topology-aware (know in advance how they should be placed on the system) and the system changes that have been made to enable them will be
discussed.

Submitted On:
11 Aug 2011
File Size:
6,974.41 Kb
Downloads:
0
File Author:
C. Vizino
Submitted On:
11 Aug 2011
Rating:
Total Votes:0
Be the first to comment! Please sign in or register.